
It is an integrated facility consisting of injection, forge, paint shop, welding shop, textile and assembly line in a closed area of 5200 m2. Production is carried out in accordance with lean production principles and ISO 9001 standards.
It is an integrated facility consisting of injection, forge, paint shop, welding shop, textile and assembly line in a closed area of 5200 m2. Production is carried out in accordance with lean production principles and ISO 9001 standards.